Fortunately I was able to keep my camera turned on while observing some of the frac process at the 1H unit.
Transfer lines carry water from a large tank to the 1H location during the fracing process. The tank is about 3/4 mile south of the actual drill.
Water is sucked from frac tanks by 'blenders' to a tub, where it is mixed with chemicals and sand. It is then pumped down into the well under extreme pressure, which fractures the shale.
No comments:
Post a Comment