
ETP's pressure test dump and 'pig' cleaning the interior of their 42" transmission line near Osceola.

The interior of the pipeline on the left is being cleaned by a device called a 'pig', moving from the south to the north

. Ever stand next to a jet! The line on the right has been pressure tested and the 9 million gallons of water is being dumped into a large rectangular 'tank' lined with

bales of hay.
The filtering tank.
No comments:
Post a Comment